All industries

Sprint capacity that matches reality.

Time tracks itself from the repo, sprint capacity forecasts from real velocity, and cost per feature stops being a guess.

Start free trial
3

repos linked, on average

92%

of engineering time auto-attributed

1 sprint

to a reliable forecast

20+

tools connected

How engineering teams set it up.

Four things to configure, then it mostly runs itself.

Link the repos

GitHub, GitLab or both. Commits and PRs attribute to the task they reference, automatically.

Mirror the tracker

Two-way sync with Jira or Linear keeps status, assignee and estimates aligned in one place.

Set sprint capacity

Forecast from the last three sprints of real hours, not from a number someone picked.

Cost per feature

Bill and cost rates roll engineering hours into a per-epic cost your finance team can read.

Where the sprint actually went.

Planned versus logged, per work type — so the next estimate is grounded in the last one.

Feature work96h
Bug fixes41h
Code review27h
Unplanned / interrupts18h
SPRINT 24 TOTAL182h

FAQs

Do developers have to start a timer manually?

Rarely. Commits, PRs and calendar events draft the entry; the developer confirms it in a couple of seconds.

Does this work with self-hosted GitLab?

Yes, self-hosted GitLab and GitHub Enterprise are both supported.

Will it conflict with our Jira workflow?

No. Sync is two-way and field-mapped, so Jira stays the source of truth for status if you want it to be.

Can we track time per epic and per repo?

Both, plus per service if you tag repos by service.

Our estimates finally reference what the last sprint actually cost.

Priya NandanEngineering Manager, Meridian Labs

Forecast a sprint from real hours.

Free for 14 days, including repo and tracker sync.